Delivering Excellence Through Digital Execution

Project Name
25+ Major Projects
Location
EMEA
Client
Leo Lynch
Duration
10+ years
Cost
N/A

Leo Lynch Case Study

Introduction 

Founded in 1956, Leo Lynch is a specialist mechanical, electrical and process engineering contractor that supplies modular and bespoke process engineering and mechanical engineering. In addition, Leo Lynch delivers offsite manufacturing (OSM), lift and shift and various turnkey manufacturing, engineering and construction solutions to the life sciences, advanced technology, food and beverage, commercial and data centre sectors. With BIM coordination up to LOD500, extensive off-site manufacturing, and a strong reputation for quality and safety, Leo Lynch consistently meets the high standards of regulated environments. Over the last decade, Leo Lynch and EIDA Solutions have built a strong partnership, deploying EIDA’s construction management, commissioning and turnover platform across 25+ major projects in Ireland and internationally. This collaboration has become a cornerstone in Leo Lynch’s digital delivery strategy.

The Challenge

Before EIDA, project teams were spending countless hours manually managing documentation, commissioning data, and turnover packages through spreadsheets and disconnected systems. These manual processes caused:

  • Rework due to version control issues and GDP noncompliance
  • Delays in turnover submissions to general contractors and end clients
  • Limited visibility across multiple trades and project phases
  • Difficulty maintaining compliance on LEED, GMP, and BREEAM-certified projects

Leo Lynch sought a digital transformation partner that could unify documentation deliverables, standardise QA/QC processes, and provide real-time project visibility, ensuring a smooth handover process to clients.

“As a Quality Manager delivering complex M&E projects in the pharmaceutical, advanced technology, and data centre sectors, maintaining quality and compliance is at the forefront of what we do and EIDA has helped us massively in this journey to maintain our high standards. Before using EIDA, managing inspections, documentation, and handover data meant juggling spreadsheets and manual processes, it was time consuming, laborious and prone to errors.”

Darragh O’Keeffe, Quality Manager, Leo Lynch

Pain Points 

Pain Point: Manual documentation handling slowed down approvals and turnover —> Impact: Delayed project completion and handover acceptance.

Pain Point: Siloed data between trades caused coordination errors —> Impact: Increased rework and compliance risk

Pain Point: Limited visibility into turnover and commissioning progress —> Impact: Difficult to forecast readiness or resource allocation

Pain Point: Compliance documentation requirements (GMP, LEED, WELL,NZEB, BREEAM) were time intensive —> Impact: Admin burden and risk of nonconformance

The EIDA Solution

To address these challenges, Leo Lynch implemented EIDA’s Construction Management, Commissioning & Turnover platform, structured around four solution pillars:

1. Centralised Documentation & Control

  • Eliminated 80% of manual time spent downloading, marking up, and re-uploading files
  • Maintained full audit trails of commenters and approvers
  • Standardised and digitised vendor and trade documentation deliverables across all stakeholders

2. Digital Commissioning & QA/QC

  • Enabled real-time logging of inspection and commissioning checkpoints from mobile devices
  • Reduced error and omission risk through traceable workflows
  • Delivered faster commissioning closeouts, shaving an estimated 2–3 weeks off final completion on large projects

3. Automated Turnover Pack Generation

  • Compiled client-ready documentation deliverables instantly
  • Ensured full compliance with LEED, WELL, NZEB, and BREEAM documentation
  • Saved an average of over 100 workdays per project in turnover delivery

4. Live Dashboards & Analytics

  • Delivered real-time visibility into system readiness, QA progress, and resource performance
  • Produced data-driven insights to identify bottlenecks and drive accountability
  • Shared dashboards directly with GC’s and clients, strengthening trust and transparency

Implementation across key projects

Confidential Client – Pharmaceutical project – Munster, Ireland

  • Full clean utility packages and Mechanical install
  • Process, Mechanical, OSM, Modular and Lift & Shift services delivered
  • EIDA ensured consistent documentation and sign-off for each upgrade phase
  • Digital Testpacks and streamlined handover

Confidential Client Semi-conductor project – Oxfordshire, UK

  • Initial construction of new facility, complete mechanical install and basebuild
  • All small-to-large mechanical installation projects are continuing since commencement in production
  • Ongoing upgrade to tools, overall maintenance and pipework fabrication of the facility
  • EIDA ensured increased quality and expedited project turnover and maintains standards through all projects on the site

Confidential Client – Live Pharma Installation – Newbridge, Ireland

  • Process and HVAC systems within an active pharmaceutical facility
  • Mechanical installation, Lift & Shift and OSM
  • Enabled live coordination and compliance tracking in a fully operational pharma environment

Confidential Client – Mechanical & Electrical Installation for Medical Device Manufacturing Facility – Oxfordshire, UK

  • Pipework fabrication, delivery and installation
  • EIDA ensured schedule certainty, increased quality and Just In Time (JIT) delivery
  • Trade documentation and data prior to testing and handover available in advance of System Turnover facilitating earlier commencement of C&Q activities

leo lynch pipe work

Results & Measurable Impact

  • 80% reduction in time spent organising and submitting turnover information
  • A fully traceable fabrication process where 50k+ welds can be tracked and handed over in confidence
  • 2–3 weeks faster commissioning across mechanical and process systems
  • 30% reduction in rework through consistent QA/QC tracking
  • Zero non-conformances during commissioning audits (documentation) on flagship projects
  • Improved visibility, compliance, and client satisfaction across all project phases

EIDA has transformed how we deliver projects. From Quality Assurance through to handover and commissioning, everything is now traceable, collaborative, and audit-ready. It’s become an integral part of how we ensure quality for our clients. All key areas work and come together seamlessly, streamlining the entire process and eliminating unnecessary admin, rigid man hours, and the usual headaches.”

Darragh O’Keeffe, Quality Manager, Leo Lynch

Looking Ahead

With a proven digital foundation in place, Leo Lynch continues to roll out EIDA across upcoming projects in Ireland, the UK, and Europe. As sustainability, traceability, and data-driven delivery become industry standards, Leo Lynch is positioned to stay ahead — leveraging EIDA to deliver faster, safer, and smarter projects in every sector.

Request a Demo

Please complete this form, and one of our senior consultants will be in touch to arrange a Demonstration & Discovery call at a time convenient for you.
*Indicates a Required Field.
Contact

Let’s Talk

Find out how EIDA can bring more structure and flow to your projects, reducing risk and increasing quality. Talk to a senior consultant today.